Nuclear waste repository shaft Konrad

A huge loader drives in the nuclear waste repository shaft Konrad on the third level at a depth of 1000 metres in Salzgitter, Germany, 15 August 2017. Preparational work for the new underground workshop is being done. One can see the future mechanical workshop for large vehicles. The former iron ore mine is currently being prepared for the future use as a nuclear waste repository at various points. Photo: Silas Stein/dpa (Photo by Silas Stein/picture alliance via Getty Images)
A huge loader drives in the nuclear waste repository shaft Konrad on the third level at a depth of 1000 metres in Salzgitter, Germany, 15 August 2017. Preparational work for the new underground workshop is being done. One can see the future mechanical workshop for large vehicles. The former iron ore mine is currently being prepared for the future use as a nuclear waste repository at various points. Photo: Silas Stein/dpa (Photo by Silas Stein/picture alliance via Getty Images)
Nuclear waste repository shaft Konrad
PURCHASE A LICENCE
How can I use this image?
$475.00
+GST AUD
Getty ImagesNuclear waste repository shaft Konrad, News PhotoNuclear waste repository shaft Konrad, News PhotoNuclear waste repository shaft Konrad Get premium, high resolution news photos at Getty ImagesProduct #:999202890
$650+GST$200+GST
Getty Images
In stock

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.
Credit:
picture alliance / Contributor
Editorial #:
999202890
Collection:
picture alliance
Date created:
15 August, 2017
Upload date:
Licence type:
Release info:
Not released. More information
Source:
picture alliance
Object name:
urn_newsml_dpa_com_20090101_170818-99-697090-3
Max file size:
4327 x 2720 px (36.64 x 23.03 cm) - 300 dpi - 8 MB