Construction Four Seasons Hotel And Residences

TORONTO, ON - NOVEMBER 29: Over a 12-14 hour period, 400 cements trucks will convene at six different pouring locations to pour the foundation for the Four Seasons Hotel and Residents. About 120 trucks per hour will unload concrete in a continuous pour. to allow for the simultaneous pour, traffic will be stopped on Yorkville between Yonge & Bay, and Bay will be closed south from Scollard to Bloor. (Keith Beaty/Toronto Star via Getty Images)
TORONTO, ON - NOVEMBER 29: Over a 12-14 hour period, 400 cements trucks will convene at six different pouring locations to pour the foundation for the Four Seasons Hotel and Residents. About 120 trucks per hour will unload concrete in a continuous pour. to allow for the simultaneous pour, traffic will be stopped on Yorkville between Yonge & Bay, and Bay will be closed south from Scollard to Bloor. (Keith Beaty/Toronto Star via Getty Images)
Construction Four Seasons Hotel And Residences
PURCHASE A LICENCE
How can I use this image?
$650.00
AUD

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.
Credit:
Keith Beaty / Contributor
Editorial #:
458329552
Collection:
Toronto Star
Date created:
03 November, 2014
Upload date:
Licence type:
Release info:
Not released. More information
Source:
Toronto Star
Object name:
KB_concrete_1
Max file size:
3916 x 2614 px (33.16 x 22.13 cm) - 300 dpi - 3 MB